Quick answer
Structural steel framing uses wide-flange beams, steel columns, tube posts and moment frames to carry loads that wood framing cannot handle efficiently. It is common in remodels that remove bearing walls, additions with long spans and modern homes with large openings. An engineer sizes the members; a structural fabricator details, welds and installs them.
Key points
Beams, columns, posts, lintels and moment frames built from your engineer's stamped design
Shop drawings for every member and connection, approved before fabrication
Field verification of bearing points, elevations and existing framing
Bolted or field-welded connections planned around access and crane limits
Primer, paint, galvanizing or fire-protection-ready surfaces as specified
What does structural steel framing include?
In residential and light commercial work, structural steel framing usually means a handful of heavy members doing jobs that would otherwise take many wood members or would not work in wood at all. Typical pieces include wide-flange beams (the I-shaped W sections), hollow structural section (HSS) tube columns and posts, steel angle and plate lintels over masonry openings, and welded or bolted moment frames.
Steel also shows up in hybrid assemblies. A flitch plate bolted between two wood joists, a steel ledger for a deck on a masonry wall, or a steel post set inside a stud wall to carry a point load are all part of this work. The goal is the same in each case: put the load on a member stiff and strong enough to carry it without bulky depth or extra posts.
We fabricate these members from the sizes and connections your engineer specifies. If you do not have an engineer yet, we can explain what information they will need and recommend firms that work on residential steel.
Beams, columns or a moment frame: which system fits?
A simple beam on two posts is the most economical way to open a wall. The beam carries vertical load from the floor or roof above, and posts carry that load down to a footing. It works well when the posts can land somewhere sensible and the opening does not need to resist sideways force.
A moment frame is different. Its beam-to-column joints are rigid, either through full-penetration welds or heavy bolted end plates, so the frame resists racking from wind or earthquakes without diagonal bracing or solid shear walls. Architects use moment frames to keep a wall of sliding glass doors open or to replace a shear wall that a remodel is removing. In Texas, wind usually drives that lateral design, and a moment frame along the open garage wall is a common solution in narrow-lot Houston townhomes.
Moment frames cost more than simple beams because of the connection work, the need for base plates and anchor bolts designed for overturning, and stricter tolerances. Your engineer decides which system the building needs; our role is to make that system buildable and to point out where a connection detail will be difficult in the field.
Simple span beam: vertical loads, lowest cost, needs posts at each end
Cantilevered beam: carries a balcony or overhang past its support, demands careful deflection control
Moment frame: resists lateral load, keeps openings clear, highest connection cost
Braced frame: efficient against lateral load when a diagonal can be hidden in a wall
Removing a load-bearing wall with a steel beam
This is the most common steel framing request we see. The sequence matters: the engineer confirms what the wall is carrying and sizes the beam, the builder installs temporary shoring on both sides, the old wall comes out, and the beam and posts go in before shoring is removed. In older brick and limestone buildings, such as the historic commercial blocks in San Antonio, the beam often bears on masonry and needs a steel bearing plate sized by the engineer.
There are two basic approaches. A dropped beam hangs below the ceiling and is simpler to install. A flush beam sits within the joist depth so the ceiling stays flat, which means joist hangers or welded seats on the beam and more careful coordination with the framer. Flush beams in older homes often require us to field-measure every joist bay, because spacing and depths are rarely uniform.
Getting the beam into the house is its own problem. A 20-foot W section can weigh several hundred pounds or more. We plan the route through windows, doors or a removed section of wall, and when needed we design spliced beams that are bolted together inside.
Who does what: engineer, builder and fabricator
Clear roles prevent expensive gaps. The engineer of record determines loads, sizes members, designs connections and stamps the drawings the building department reviews. The general contractor owns the schedule, shoring, demolition, foundations and permit. The fabricator turns the design into shop drawings, orders material, builds and installs the steel, and documents welding.
Shop drawings are the handoff point. They show every piece with dimensions, hole locations, weld symbols and finish notes. The engineer reviews them for conformance with the design, the architect checks them against finish intent, and the builder checks them against site conditions. Nothing is cut until they are approved.
When a field condition does not match the drawings, such as a footing in the wrong place or a joist that is not where the plan shows it, we stop and route the question back through the builder to the engineer. Improvised fixes on structural steel create risk and inspection problems.
Bolted connections, shop welds and field welds
Most steel frames combine shop welding and field bolting. Shop welds are made on the bench, in good position, with controlled conditions, which makes them faster and more consistent. Field connections are often bolted because bolting is quick, needs no fire watch and is easy to inspect.
Field welding is still necessary in many projects: moment connections, beams set into tight existing conditions, and pieces that cannot be pre-drilled because the existing structure has to be measured first. Field welding typically uses stick (SMAW) or flux-cored (FCAW) processes because they handle wind and positional work better than gas-shielded MIG.
Structural welds are generally made to procedures and welder qualifications aligned with AWS D1.1. Some jurisdictions and engineers require special inspection of certain welds, especially complete-joint-penetration welds in moment frames. Confirm inspection requirements with your engineer and local building official so the inspector is scheduled before the steel is covered.
How a steel framing job works with Iron Frame Welding
01
Drawing and site review
We review the architectural and structural sheets, walk the site and verify bearing points, elevations and access routes for getting steel into place.
02
Shop drawings and submittals
Every member and connection is drawn for approval by your engineer and architect, with mill certifications and welding procedures supplied when requested.
03
Fabrication and fit-up
Members are cut, drilled and welded in the shop, checked against the approved drawings and finished with the specified primer or coating.
04
Erection and inspection
We set, plumb and connect the steel in coordination with your framer, complete field welds and support any required special inspection before close-in.
What drives the cost of a steel framing package
Steel framing prices are driven by a handful of variables, and understanding them helps you make design choices that hold the budget. Material weight is the obvious one, but labor per connection often outweighs it. If you are reinforcing existing steel rather than adding new members, our repairs and retrofits page covers that work.
Number and type of connections: a moment connection can take many times the labor of a simple shear tab
Field welding versus bolting: field welds add setup, fire protection, inspection and weather risk
Site access: crane, lift or hand-carry, plus whether beams must be spliced to fit the route
Existing conditions: older homes need more field measurement and custom bearing details
Finish: shop primer is inexpensive; galvanizing, intumescent-ready surfaces or exposed finish work add cost
Schedule: rush fabrication, weekend installs or phased work in occupied homes
Protecting framing steel: corrosion, fire and finish
Steel inside a conditioned wall or ceiling usually needs only a shop primer, since it stays dry. Steel in crawlspaces, garages, exterior walls or anywhere exposed to moisture benefits from hot-dip galvanizing or a higher-performance paint system. Posts that sit on concrete should be detailed so water cannot pool at the base plate.
Some commercial and multifamily projects require fire protection on structural steel, using spray-applied fireproofing, intumescent coatings or gypsum enclosures. Each has surface preparation and primer compatibility requirements, so tell us early if fire protection is specified.
When framing steel will remain visible, such as an exposed beam in a loft or a moment frame that reads as part of the design, finish becomes an architectural decision. See our architectural details page for how we handle exposed welds and finishes.
Frequently asked questions
How do I know if I need a steel beam instead of wood?
An engineer makes that call based on span, load and available depth. As a rule of thumb, steel becomes attractive when an opening is wide, when a flush ceiling leaves little room for a deep wood beam, or when the beam carries a concentrated load from above, such as a post from a second floor. Engineered lumber sometimes works; steel often wins on depth.
Can a steel beam be installed without a crane?
Often, yes. Many residential beams are set with lifts, rolling gantries or manual rigging, especially in houses where a crane cannot reach. When a beam is too long or heavy for the access route, the engineer can approve a bolted splice so it arrives in pieces. We plan the method during the site visit and price it into the quote.
Do steel posts need new footings?
Usually. A post concentrates load into a small area, and existing slabs or footings are rarely designed for it. The engineer specifies the footing size and depth, and the builder or concrete contractor typically pours it. We supply anchor bolt templates so the bolts land exactly where the base plate holes are.
Will a steel beam squeak or move like wood?
Steel does not shrink or creep the way wood does, so well-installed steel framing is very stable. Noise usually comes from the wood connections to the steel, such as joists bearing on a beam flange. Proper shims, hangers, and attachment details recommended by the engineer reduce that. Deflection is controlled by the engineer's sizing.
Is welding inspection required for residential steel?
It depends on the jurisdiction and the engineer's specifications. Simple bolted beams in houses may only receive a standard framing inspection, while moment frames and complete-joint-penetration welds frequently require special inspection by a qualified inspector. Your engineer's general notes and your local building department will define what is required for your project.
How long does a steel framing project take?
Timelines depend on shop drawing approval, material availability and any outside coatings such as galvanizing. A simple beam replacement can move from approved drawings to installation in a short window, while a multi-frame addition takes longer. Installation itself is often only a day or a few days; the preparation is where time goes.